
50 kWp to multi-MW
Industrial solar
Power the mill with the roof it already has.
A pellet mill, a filler and a RO high-pressure pump are unforgiving loads. We size industrial solar against the real demand curve of the plant we also built — so the array is not an orphan on the roof.
Captive and net-metered schemes are both in scope, with structure checks on existing sheds before a single module is ordered.
- Capacity
- 50 kWp to multi-MW
- Lead time
- 3–6 months
- Power
- As designed; net-metered or captive
Process
- 01Load study and structure survey
- 02Array and inverter design
- 03Mounting, DC, AC, protection
- 04Commissioning and net metering
Equipment
- PV modules
- Inverters and ACDB / DCDB
- MMS structure
- Monitoring and protection
Standards
- IEC 61215 / 61730 modules
- CEA / DISCOM interconnection
Enquiry — Next step
