SsunGust
Soda filling plants

30–180 BPM

Soda filling plants

Carbonation that holds from mixer to cap.

Soda lines fail on temperature, pressure and CIP — not on the brochure speed. We size the mixer, the chiller and the filler as one loop, with PED-minded pressure vessels and a CIP recipe the night shift can actually run.

Glass and PET formats are both in scope. Changeover parts are listed, not promised later.

Capacity
30–180 BPM
Lead time
5–10 months
Power
Mixer, chiller and filler typically 60–220 kW

Process

  1. 01Syrup room and water treatment
  2. 02Deaeration, dosing, carbonation
  3. 03Counter-pressure fill and close
  4. 04Warming, label, pack

Equipment

  • Beverage mixer and carbonator
  • Counter-pressure filler
  • CIP unit and chiller
  • Warmer, labeller, packer

Standards

  • FSSAI CSD
  • IS 2346
  • CE machinery / PED practice on pressure vessels

EnquiryNext step

Tell us the duty.

Sends to ssungust747.sales@hotmail.com and WhatsApp +91 94653 63696 in one tap.

WhatsApp