
30–180 BPM
Soda filling plants
Carbonation that holds from mixer to cap.
Soda lines fail on temperature, pressure and CIP — not on the brochure speed. We size the mixer, the chiller and the filler as one loop, with PED-minded pressure vessels and a CIP recipe the night shift can actually run.
Glass and PET formats are both in scope. Changeover parts are listed, not promised later.
- Capacity
- 30–180 BPM
- Lead time
- 5–10 months
- Power
- Mixer, chiller and filler typically 60–220 kW
Process
- 01Syrup room and water treatment
- 02Deaeration, dosing, carbonation
- 03Counter-pressure fill and close
- 04Warming, label, pack
Equipment
- Beverage mixer and carbonator
- Counter-pressure filler
- CIP unit and chiller
- Warmer, labeller, packer
Standards
- FSSAI CSD
- IS 2346
- CE machinery / PED practice on pressure vessels
Enquiry — Next step
